25.07.2005

Keel laying of third Premicon river vessel

25.07.2005 –

Rostock-Warnemünde – At NEPTUN Schiffbau GmbH in Rostock the keel-laying ceremony for the third Premicon river vessel took place. The first prefabricated block of the newest Premicon TwinCruiser has been placed into the assembly hall.

The vessel with the hull number 0507 will be chartered to Transocean Tours and will be delivered by the end of March 2006.

01 media available

01 Images

Keel laying of third Premicon river vessel
299 x 400 @ 300 DPI | JPG | 116 KB
Download